Will the development create additional traffic in the local area?

We’re aware that proposed development can be a source of concern. Rest assured that we understand this concern, so a technical document known as a Transport Assessment has been prepared and submitted with the planning application which sets out the transport strategy for the proposals in further detail and assess potential impacts.

In addition, a draft Travel Plan has been submitted with the application. This sets out details of measures that will be introduced to ensure sustainable travel is promoted from the very outset thereby reducing impact on the local roads.

Extensive discussions have taken place with Network Rail and HCC to facilitate improvements to the pedestrian/cycle bridge over the railway. The streets within the site will be designed to 20mph and will be cycle friendly. Cycling and walking will be prioritised during the master planning process. The site’s proximity to local shops, services and the railway station will naturally reduce the need for certain trips in a car.

Will additional GP and dentist services be provided?

The planning system allows for the NHS to be consulted during the application process to identify whether there is capacity for new patients. We’re aware of local sentiment towards the Potterells Medical Centre so should a need for additional facilities be demonstrated, funding can be sought via the Community Infrastructure Levy (CIL) which has been introduced by WHBC to help fund infrastructure.

How will the site be accessed?

Vehicular access will be from Bradmore Lane with a new entrance junction installed as part of the highway works. Enhanced pedestrian cycle access will also be provided by the new foot/cycle bridge.

What mitigations will be in place for potential flooding on site?

A detailed drainage strategy has been submitted which considers the current drainage condition onsite and any potential needs for mitigation.

This drainage strategy mimics existing conditions and takes into account run off from the new development and supporting infrastructure, including allowances for increased rainfall from climate change.

The proposed strategy demonstrates there will be no adverse impact off-site, allowing for Climate Change impacts.

What is meant by an affordable home?

The Government defines affordable housing as ‘social rented, affordable rented and intermediate housing provided to specified eligible households whose needs are not met by the market.’ This includes a variety of housing products including shared ownership, social rent, affordable rent, and discounted market rent.

35% of the homes on the site will be classified as Affordable Homes in line with Welwyn Hatfield Borough Council’s policy.

There is a significant need for new affordable homes within the Borough. The affordable homes will include a range of tenures to support those on lower incomes in the community. There is also a high need for good quality affordable homes amongst RVC staff, some of whom we would hope to see living within the new development.

The Developers

Who is the developer?

Hill is the selected developer for this project. Hill is a multiple award-winning, 5-star top 20 UK Housebuilder, typically delivering between in excess of 2,500 new homes annually.

Why was this developer chosen to bring forward the development?

The RVC selected Hill through a competitive tendering exercise.  Hill was selected on the basis of their quality developments, design capabilities and their ability to ensure long lasting legacy benefits. Hill takes pride in adopting a place and people-led approach to the creation of its developments. Hill have an excellent portfolio and proven expertise in delivering beautiful homes and is a trusted partner to the RVC.

The Proposals

Why is the site known as HS22?

HS22 is the allocation reference given to part of the land in Welwyn Hatfield’s adopted Local Plan (2016 to 2036).

The Welwyn Hatfield Local Plan is the Statutory Development Plan for the Borough. This means it has full weight (together with any ‘made’ neighbourhood plans where relevant) in determining planning applications and development decisions within the Borough.

What are you proposing?

At HS22, the RVC and Hill are proposing a residential-led development of 437 homes as well as land reserved for a new 2 Form Entry Primary School along with an improved access and interface to the station, a new pedestrian and cycle bridge across the railway, new open spaces, landscaping and biodiversity measures.

What benefit will this development bring for local people?

The delivery of these homes will contribute to meeting local housing need, including 35% designated as Affordable Housing.  Local infrastructure improvements will include improved access to the railway station and enhance connections to the PRoW network. Many of our staff at the RVC are local, supporting the local economy and also benefitting from improved access and housing.

What efforts have been/will be made to ensure the proposed development fits in with the surrounding area?

During the first round of consultation feedback was sought on the style and design of the new homes proposed. As part of the proposals, the new homes have been designed to ensure that they reflect the surrounding context of Brookmans Park.

Additionally, character areas have been used to create variation and local distinctiveness across the site. The character areas will assist in wayfinding and placemaking with each having a defined approach to architectural style and materials, as well as the surrounding landscape and infrastructure, whilst also following the principles established in the Strategic Framework.

Key design features of the new homes include:

  • Frontage gable details
  • Brick patterns and contrast
  • Tile hanging details
  • Bay windows
  • Distinctive grouping of windows
  • Typical 1930s entrances

What new facilities does this scheme contribute to the local area?

The site allocation includes land reserved for a new 2 Form Entry Primary School, which will provide education facilities for the new residents on the site as well as contribute to wider need for school places. The development will bring affordable housing, which is lacking in the local area. There will also be infrastructure improvements which will come forward with the development such as a new foot/cycle bridge over the railway.

Housing

Is there a need for more housing in the area?

The Objectively Assessed Housing Need has confirmed that in excess of 15,000 new homes are required by 2036 to support the Council’s economic aspirations in a sustainable way. The Council’s most recent research (2015) showed that there is a backlog of affordable housing need of over 1,000 homes and that each year there is newly arising demand of over 500 affordable homes. In the first 7 years of the plan period just 571 new affordable homes were delivered against a need for 4,207.

The need for homes in the Borough is extremely acute. Government published data show that in WHBC just 57% of that need for new homes is being achieved.

What type of housing will be included in the proposals?

The development has been designed to provide a good mixture of 1-bed apartments through to 5-bed houses, with a detailed breakdown below:

Unit type Total
1-bed Flat 62
2-bed Flat 98
3-bed Flat 4
2-bed House 55
3-bed House 99
4-bed House 75
5-bed House 44
Total 437

As part of the proposals, character areas are proposed to create variation and local distinctiveness across the site. The character areas will assist in wayfinding and placemaking with each having a defined approach to architectural style and materials, as well as the surrounding landscape and infrastructure, whilst also following the principles established in the Strategic Framework. The proposals have also been designed to ensure that they reflect their surrounding context.

Will there be affordable housing provided at the site?

There is a significant need for new affordable homes within the Borough. This site will deliver 35% Affordable Homes across a range of tenures to support those on lower incomes in the community. There is also a high need for good quality affordable homes amongst RVC staff, some of whom we would hope to see living within the new development.

What is meant by affordable housing? Will I be able to live here?

The Government defines affordable housing as ‘social rented, affordable rented and intermediate housing provided to specified eligible households whose needs are not met by the market.’ This includes a variety of housing products including shared ownership, social rent, affordable rent, and discounted market rent.  35% will be Affordable Homes in line with WHBC’s policy.

Will any of the houses be reserved for people who already live in the area?

The 35% designated Affordable Homes are to meet local needs. We are looking at a range of innovative schemes.  The RVC is exploring opportunities to own properties within the development.

Local Infrastructure

What facilities will be included on the development?

The development is proposing to provide a wide range of different facilities and infrastructure improvements on and surrounding the site. This currently includes:

  • Land reserved for a new two-form entry primary school
  • A new cycle and pedestrian bridge over the rail line
  • Onsite landscaping and play space improvements
  • Enhanced connections to the station and wider Public Rights of Way network

Is there capacity at the local doctor’s surgery to accommodate new residents?

The NHS will be consulted during the application process to identify whether there is capacity for new patients. Should a need for additional facilities be demonstrated funding can be sought via the Community Infrastructure Levy (CIL) which WHBC has introduced to fund infrastructure.

Is there capacity at the surrounding dental practices to accommodate new residents?

Dentists operate as private businesses, and it is not possible therefore for a developer to fund improvements.

What are the plans for a bridge over the railway line?

The proposals include a new cycle and pedestrian bridge over the rail line which meets current design standards. The design provides a new and improved entrance to the station from the development.

Will there be any improvements to the railway station?

The design provides a new and improved entrance to the station from the development. Other improvements to the station, such as accessibility, are the remit of Network Rail. CIL money received by the Council could be used to fund those improvements should a scheme be agreed with Network Rail.

Will there be any funding available for schools/sixth forms in the local area to provide additional places for new residents?

CIL has been introduced by WHBC to fund new infrastructure. Discussion remain ongoing between the applicants and WHBC/HCC regarding CIL/S016.

When will the new primary school on site open?

Hertfordshire County Council will be required to notify Hill when they would like the primary school land to be transferred to them. The County Council will then submit a detailed design for the school. Discussions on timescales for transfer remain ongoing.

Are you proposing to improve our broadband speeds?

This is not within our direct control as Government has made telecoms utility companies responsible for the delivery of a network of broadband.

Transport and Access

How many parking spaces will be provided?

This has been determined according to policy and through the master planning process. The proposals will provide policy compliant levels of parking for the site, taking into account the parking standards of Welwyn Hatfield Council. This will be agreed ahead of the determination of the application at planning committee.  As part of our active travel planning for the development, we will be examining measures such as a car club on site.

What transport links are there to the site?

HS22 is located immediately adjacent to Brookmans Park Railway Station and approximately 100m to the west of two bus stops serving 5 bus routes (200, 201, 242, 305 and 610).  A new cycle/pedestrian bridge will also be provided.

How much traffic will the development cause?

A Transport Assessment has been submitted with the planning application which sets out the transport strategy for the proposals in further detail. In addition, this report includes an assessment of the offsite transport, traffic and sustainable transport network impacts.

In addition, a draft Travel Plan has also been submitted with the application. This sets out measures that will be introduced to ensure sustainable travel is promoted from the very outset thereby reducing impact on the offsite highway network.

Will sustainable transport be encouraged? Will cycle routes be developed/improved?

Extensive discussions have taken place with WHBC, HCC and Network Rail to facilitate improvements to the pedestrian/cycle bridge over the East Coast Mainline (ECML). The streets within the site will be designed to 20mph and be cycle friendly. Cycling and walking will be prioritised during the master planning process. New connections are also provided to the Public Rights of Way network.

How will residents access the site?

Vehicular access will be from Bradmore Lane with a new entrance junction installed as part of the highway works. Enhanced pedestrian cycle access will also be provided by the new foot/cycle bridge. Discussions on this are ongoing with the Local Authority.

Landscaping and Amenities

What sort of landscaping and amenity space will be provided with the scheme?

The site will contain extensive green open spaces for residents – approximately 6.5 hectares.

Will private green space be provided for residents?

All houses will have private garden spaces and apartments will have private balconies or terraces and access to shared green spaces.

Will play areas be created for children?

Yes. This has been master planned through a placemaking approach ensuring that open space, play and landscaping is central to the proposals.

How will it impact local schools?

Land is reserved on site for a 2-form entry school, including Early Years provision. The development itself is likely to generate a need for around half the capacity of that school. For secondary education, The Chancellor’s School is located just 1.7km away, meaning there will be low impact on school traffic and congestion. The Chancellor’s School is considered larger than average secondary schools in Hatfield, accommodating 1104 students. It is currently undergoing construction works to increase capacity and improve facilities.

The Site – HS22

Is it sustainable to develop the HS22 site?

The local plan inspector considered HS22 to be one of the most sustainable sites in the Borough given its location in Brookmans Park (categorised as a Large excluded village) and its close proximity to services and facilities within the village and a mainline rail station.

Will the development be sustainable?

Both the RVC and Hill are committed to sustainable development and the RVC has played an active role in the design process, engaging with the necessary design review panels and working to achieve long-term legacy for the site.

The development is located in close proximity to existing facilities and amenities, with the majority of services within walking and/or cycling distance. This will significantly reduce the number of people driving – reducing air pollution and fuel use. The development is also within proximity to the Brookmans Park rail station and 2 bus stops – promoting sustainable transport.

Hill has abandoned gas as a source of supply in its new developments, utilising an energy strategy which adopts a fabric first approach to reduce energy use and then uses air source heat pumps as the primary source of energy generation.

Water saving measures will be installed that limit consumption to 110lpppd.

What existing facilities are close to the site?

The village centre lies within an 800m walk of the whole site.  The village centre includes around 40 shops, cafes, dry cleaners, takeaway restaurants, osteopath, dine-in restaurants estate agents services, etc including the Brookmans Pub, local Post Office, Pharmacy, Library and the Co-Op Food Store. It is also close to the Brookmans Park United Reformed Church and Community Hall, the Potterells Medical Centre, Brookmans Park Primary School, Chancellor’s School and the RVC’s Hawkshead Campus.

The site offers significant benefits in that it is close (in walking/cycling distance) to a wide variety of community facilities and amenities.

As the site is in the Green Belt, how can you justify building on the site?

The proposed new homes and school all located on land which has been removed from the Green Belt and is allocated for development in the Borough Council’s Local Plan. To the south of the proposed homes an area of the application remaining within the Green Belt accommodates uses which are identified in the NPPF as being compatible with the Green Belt, eg open spaces and biodiversity enhancements.

What mitigation are you planning to reduce any harm to the Green Belt/landscape?

A detailed Landscape and Visual Impact Assessment has been submitted. That considers the potential impact of the proposals on the surrounding Green Belt and any mitigation measures required. This includes:

  • Providing a green infrastructure corridor adjacent to Brick Kiln Wood WS144.
  • Additional hedging/tree planting along the northern boundary of the site to maintain the open nature of the Green Belt to the north by strengthening the visual screen provided by the existing hedgerows.
  • Creating a wide multifunctional green corridor along the southern boundary of the site to screen the development from wider views, provide recreational space including active transport routes and protect / enhance the biodiversity of the Ray Brook. This includes natural / semi-natural greenspace, footpaths, substantial tree planting and ecological enhancements.

Miscellaneous

How will the development be funded?

The development is being delivered and funded by Hill.

Does Council policy allow for this development?

Yes. The site is allocated for development within the Borough Council’s Local Plan.

Planning and technical

When will you be submitting a planning application?

The planning application was submitted in January 2026.

What is a “full” planning application?

A full planning application requires complete details of the scheme, such as scale, vehicular access, orientation of the buildings, site elevation, pedestrian access, parking and drainage.

If granted, it means that all the details of an application are approved and the scheme may proceed as planned, subject to satisfying any conditions attached to the consent; the applicant is given total clarity about what they can do, and the local authority cannot object at a later date. While a decision should be made within eight to 13 weeks of applying, the full process of obtaining surveys, plans and other required documents can take between six and nine months.

When a planning authority receives a planning application, it will register it in the planning system, send acknowledgement to the applicant and clarify the next steps to be taken. If more information is required at this stage, the local authority will request it.

What is an “outline” planning application?

An outline planning application is one where the details of the scheme, such as scale, vehicular access, orientation of the buildings, site elevation, pedestrian access, parking and drainage, are left for future consideration. The school element is in outline because that will designed and delivered by HCC once the need for the school is confirmed.

What is a “hybrid” planning application?

A hybrid planning application is one where some elements of the scheme are detailed, and some are in outline. We have submitted a hybrid with the residential elements, landscaping, access and bridge in detail. The school is in outline.

What is a Masterplan Framework?

It is a set of plans and supporting information that describes the overall vision, design concept and structure for new development. A masterplan should be supported by an evidence base that shows a detailed understanding of local character and context and the key issues and opportunities that need to be addressed.

Will the development impact on or effect local heritage and archaeology?

The local plan inspector agreed that there was unlikely to be any impact on the listed walled garden adjoining Potterells. The local plan requires that the impact of traffic on listed properties in Water End be considered. Baseline assessments suggest there is a low likelihood of significant archaeological finds. In the highway close to the site are a number of WW2 anti-tank traps. These offer the potential to be positively considered in the development and to become a feature.

A Heritage Impact Assessment has been submitted as part of the application. The Local Authority and statutory consultees will review proposals for heritage and archaeological impacts.

Are you aware of any significant archaeological reserves on site?

Baseline assessments suggest there is a low likelihood of significant archaeological finds.

What is a Section 106 (S106) legal agreement?

Section 106 agreements are legal agreements between a planning authority and a developer which secure the provision of measures to mitigate the impacts of development.

What is CIL?

The Community Infrastructure Levy (the ‘levy’) is a charge which can be levied by local authorities on new development in their area. It is an important tool for local authorities to use to help them deliver the infrastructure needed to support such developments.

The levy only applies in areas where a local authority has consulted on, and approved, a charging schedule which sets out its levy rates and has published the schedule on its website.

Most new development which creates net additional floor space of 100 square metres or more, or creates a new dwelling, is potentially liable for the levy.

When will the S106 and other infrastructure provisions be paid?

This is dependent on when the planning application is approved by the Welwyn Hatfield planning committee. At this early stage it is difficult to tell when exactly this will be.

However, the S106 agreement will put in place a timeframe to provide the infrastructure payments to the Council, which will be agreed with the Council before construction can commence.

When will the CIL be paid and other infrastructure provisions delivered?

This is dependent on when the planning application is approved by the Welwyn Hatfield planning committee. WHBC’s CIL charging schedule sets out when payments are to be made.

The S106 agreement will put in place a timeframe to provide measures such as the affordable housing, transfer of land for the school and the requirements for making available the self/custom-build plots.

Construction

When is construction likely to start?

Construction will commence following the planning application being approved by Welwyn Hatfield Council. At this stage, it is difficult to say when this will be. However, this will occur once the application has been approved and conditions set to the application have been discharged by the Council.  A start is currently expected at the end of 2027.

In summary, construction will not begin until agreement with the Council to do so has been secured. We will keep the local community informed of developments.

When do you expect the first homes to be delivered on site?

This is dependent on the timeframe for securing planning permission for the proposals and discharging conditions on the application to begin construction and the sequence of providing the development onsite.

The first homes will likely be ready for occupation between 12 – 18 months after construction has begun.

How will we know what works are taking place on the development?

As a Considerate Constructor, Hill will notify the local community when works are expected to start. Hill will provide contact details for local residents to contact in the event they have any concerns or wish to discuss elements of the construction.

If planning permission is granted, a construction management plan will be required to be submitted and approved before any construction works can commence.

This construction management plan will detail the construction times and what measure will be taken to mitigate issues such as dust, noise and vibrations. After the plan has been approved, then updates will be sent to residents explaining the working times of contractors as well as predicted timeline of works.

Where enabling works or ground investigations have been undertaken to date, stakeholders have been notified in line with this plan and without any issues.

Will you be writing to residents when works are due to be undertaken?

Yes. This will take into account the major construction works onsite and potential impact on the local highway network and infrastructure. We will notify key stakeholders via email and send letters to local residents in advance of the works.

How will you mitigate construction traffic and disruption on Station Road and Bradmore Lane?

In addition to this, there will be a communications plan in place for works that effect the local highway network, or that will take place close to existing residential properties. This could include a targeted letter drop, signage and information on our communications channels.

Who should residents contact if they have issues during construction?

Details of the site managers will be provided in clear locations. However, wider contact information will be made available and communicated to local residents.

Landscape, ecology and biodiversity

Will you be seeking to achieve 10% biodiversity net gain?

The proposals secure a 10% gain on site in relation to hedgerow and watercourse units. Meeting the statutory 10% gain in habitat units will be achieved through the purchase of off-site habitat units from a registered habitat bank.

How will the shared green spaces be maintained?

It is likely that the majority of the public realm will be managed by a Management Company.  The exceptions being the main site junction with Bradmore Lane (adopted by HCC), the school land (transferred to HCC), the affordable housing and its associated amenity space (transferred to a Registered Provider).

Will the woods to the west of the site be affected by the development?

No.  Measures will be put in place to ensure the integrity of the ancient woodland is not affected.

Can we walk through the woods?

Brick Kiln Wood is a highly sensitive habitat, with around two thirds of it designated as ancient woodland.  It is the general presumption, by wildlife bodies and organisations, that public access to such habitats should be limited.

Sustainability and flooding

Will the development cause an adverse effect on flooding in the local area?

No. There is a requirement in planning policy to have no adverse impact off-site, and to allow for Climate Change impacts.

What drainage strategy is being proposed?

A detailed drainage strategy has been submitted which details the current drainage condition onsite and any potential needs for mitigation. This drainage strategy mimics existing conditions and take into account run off from the new development and supporting infrastructure, including allowances for increased rainfall from climate change.

Will the drainage strategy be sustainable in terms of climate change?

Yes, the drainage strategy will need to allow for Climate Change.